Environmental Engineering & Site Assessment Services in Florida

Find it before the lender does.

Phase I and Phase II ESAs, FDEP contamination assessment, hazardous materials screening, and solid waste permitting. Same office, same engineers, same rigs as our geotechnical work.

Request an ESA Proposal

Get in touch

Call the office, or send us the site details and we will come back with scope and schedule.

  • Phone 386.734.8444
  • Office
    605 West New York Avenue, DeLand, FL 32720
Contact us
Calm river with tree-lined shore, docks, grassy banks, a parked black truck, and a bright blue sky with clouds.

Phase I Environmental Site Assessment

10-15 Business Days, Typical

The standard due diligence step in a commercial property transaction, performed to ASTM E1527-21. Non-invasive, meaning no drilling and no sampling. It satisfies All Appropriate Inquiries, which is the basis of the innocent landowner defense under CERCLA.

  • Historical aerials, Sanborn maps, city directories, title records
  • Federal and Florida regulatory database search
  • Site reconnaissance: tanks, staining, drums, transformers, and wells
  • Owner, occupant, and local government interviews
  • Report identifying RECs, CRECs, HRECs, and de minimis conditions

Phase II Environmental Site Assessment

Triggered when a Phase I finds a Recognized Environmental Condition. Performed to ASTM E1903-19.

We test for petroleum hydrocarbons, heavy metals, pesticides, and solvents in soil and groundwater, plus lead and asbestos in building materials.

Field investigation

We schedule the drilling and well installation ourselves, so a Phase II mobilizes in days rather than weeks.

Laboratory analysis

Florida-certified lab under chain of custody, with the analyte list matched to the suspected release.

Reporting

Results against Cleanup Target Levels, and a plain statement of options: delineate, close, remediate, or reprice.

Phase I vs. Phase II at a glance

Phase I ESA Phase II ESA
Standard ASTM E1527-21 ASTM E1903-19
Sampling None. Records and reconnaissance only Soil borings, groundwater wells, lab analysis
Answers Is there reason to suspect contamination? Is contamination actually present, and at what level?
Typical schedule 10–15 business days 3–6 weeks including laboratory turnaround
Who orders it Buyers and lenders, pre-closing Buyers, sellers, and attorneys after a REC is found
Outcome Proceed, or recommend Phase II Results vs. Florida Cleanup Target Levels, and next steps

FDEP petroleum & non-petroleum assessment

Once a discharge is confirmed, Florida sites follow a defined regulatory path. We run it end to end.

Rule 62-770

Petroleum contamination cleanup criteria for storage tank discharges.

Rule 62-780

Non-petroleum cleanup criteria covering solvents, metals, and other regulated substances.

  • Site Assessment Reports and addenda
  • Soil and groundwater contamination delineation
  • Natural Attenuation Monitoring plans
  • Remedial Action Plans and No Further Action pursuit
  • UST closure assessments and removal oversight

Hazardous materials testing

Before the demolition permit, not after.

Where a building is involved, we sample suspect materials for asbestos, lead-based paint, and PCBs and report the results inside the same environmental assessment, using an accredited laboratory.

  • Building Inspection

    Survey of suspect materials: floor tile, roofing, insulation, joint compound, transite.

  • Bulk Sampling

    Accredited laboratory analysis reported by homogeneous material area.

  • Air & Clearance Sampling

    Monitoring during abatement and final clearance so containment can be released.

  • Other Regulated Materials

    Lead paint screening, mold assessment, hazmat inventories.

Solid Waste Engineering & Permitting

We have permitted and monitored solid waste and recycling facilities in Central and Northeast Florida, including the Samsula Landfill for Volusia County.

  • FDEP facility permitting and renewals
  • Groundwater monitoring plans and well networks
  • Landfill gas and leachate monitoring support
  • Closure and long-term care planning
  • Geotechnical support for cells, liners, and covers

Monitoring Well Installation

Groundwater data underpins nearly every environmental determination in Florida, and its quality starts with how the well was built.

  • Temporary and permanent well installation and development
  • Network design for delineation and compliance monitoring
  • Low-flow and conventional sampling under chain of custody
  • Water level gauging and flow direction analysis
  • Well abandonment and closure documentation

Same capability supports our stormwater and groundwater work.

Samsula Landfill · Volusia County

Multi-year permitting, groundwater monitoring, and compliance support for a county solid waste facility.

Who needs an ESA

  • Buyers
    Preserves the innocent landowner defense. Skip it and you inherit someone else's release.
  • Lenders & SBA
    Most commercial lenders require a Phase I before funding.
  • Developers
    Former gas stations, dry cleaners, and ag land carry known risk. Find it in diligence, not in construction.
  • Sellers
    A pre-listing Phase I keeps a discovered condition from repricing the deal late.
  • Municipalities
    Land acquisition, brownfield redevelopment, and facility siting on a procurement schedule.
  • Attorneys
    Foreclosure, bankruptcy, and estate transfers needing an opinion that holds up.

Environmental FAQ

What is a Phase I Environmental Site Assessment?

A non-invasive investigation to ASTM E1527-21: records review, database search, site walkover, and interviews, identifying Recognized Environmental Conditions. No sampling. It satisfies All Appropriate Inquiries.

How long does a Phase I ESA take?

Typically 10 to 15 business days. Database and historical records retrieval drive the schedule. Expedited delivery available for a closing date.

When do I need a Phase II ESA?

When the Phase I identifies a REC. Phase II follows ASTM E1903-19 with borings, monitoring wells, and lab analysis.

How long is a Phase I ESA valid?

Generally 180 days under All Appropriate Inquiries, with components requiring update past that and the report no longer satisfying AAI after one year. If closing slips, an update usually suffices.

What are FDEP Rules 62-770 and 62-780?

62-770 governs petroleum contamination cleanup criteria; 62-780 governs non-petroleum. Both set the assessment and remediation sequence to reach No Further Action.

Do I need asbestos testing before demolition?

NESHAP calls for a thorough inspection before most demolition and renovation, regardless of building age.