Central Florida sits on karst. Limestone dissolves, cavities form, and the first surface sign is a depression or a door that stops closing. Confirming it takes borings into the rock, not a visual inspection.
Subsurface exploration & soil borings
Every investigation starts here: blow counts through the zone of influence, samples for classification, groundwater at drilling and after stabilization.
Design and verification under one roof
The compaction criteria in our report are the same criteria our soil compaction testing crews verify in the field. No arguments about what the spec meant.
What a geotechnical report contains
Eight sections, one seal. This is what you are actually buying.
-
01 · Project & site description
The structure, loads, and site as we understand them. -
02 · Boring location plan
GPS-located positions on your site plan in AutoCAD. -
03 · Boring logs
SPT N-values, USCS classifications, recovery, and groundwater levels. -
04 · Laboratory results
Moisture, grain size, Atterberg limits, organic content. -
05 · Foundation recommendations
Bearing pressure, embedment, settlement, pile capacities. -
06 · Earthwork criteria
Undercut, fill spec, lift thickness, target compaction. -
07 · Monitoring recommendations
What to test during construction to confirm the assumptions. -
08 · Signature & seal
Signed by a licensed Florida PE. Raw data won't substitute.
Geotechnical FAQ
What is included in a geotechnical report?
Boring location plan, boring logs with N-values and USCS classifications, groundwater levels, lab results, foundation recommendations, earthwork criteria, and monitoring recommendations, all sealed by a Florida PE. Full breakdown above →
How many soil borings does my project need?
Count and depth follow structure type, footprint, and load. A residence may need two; a mid-rise needs a grid across the footprint extended below the depth of significant stress influence. We set the program from your site plan and structural loads.
How deep do soil borings go in Florida?
Shallow-foundation commercial work commonly runs 20 to 50 ft. Sinkhole and deep foundation work goes further. Wiley Nash ranged from 48 to 115 ft.
How long does a geotechnical investigation take?
Mobilize 1-2 weeks, drill 1-3 days, sealed report 7-10 business days after that. Expedited available for permitting deadlines.
Geotechnical Engineer vs. soil testing company: what's the difference?
A testing company collects and tests samples. An engineering firm interprets the data and takes professional responsibility for the recommendations, sealing the report. Building departments and lenders require the seal.
Do I need a geotechnical report for a residential addition?
Often, yes: when you add structural load, build over questionable fill, or sit in an area with sinkhole history. Your building department or structural Engineer will confirm.
Foundation repair